Solution
27
2024
-
12
Laoshan Bay Hotel, Qingdao, Shandong Province
Shandong Qingdao Laoshan Bay Hotel, total air-conditioning area: 10276m2, of which, the hotel part of 3908.3 square meters, the guest rooms part of 6367.7 square meters, hot water consumption is 30 tons per day. Cooling and heating using fan coil, summer indoor temperature of 26 ℃, winter indoor temperature of 20 ℃, air conditioning and hot water to meet at the same time.
Shandong Qingdao Laoshan Bay Hotel, total air-conditioning area: 10276m², of which, the hotel part of 3908.3 square meters, the guest rooms part of 6367.7 square meters, hot water consumption is 30 tons per day. Cooling and heating using fan coil, summer indoor temperature of 26 ℃, winter indoor temperature of 20 ℃, air conditioning and hot water to meet at the same time.
The project is equipped with six sets of 50 HP low-temperature air source heat pumps and three sets of 25 HP low-temperature full heat recovery air source heat pumps, and one 40-ton square hot water holding tank. The parallel installation of multiple external units ensures that when a single unit fails, it will not affect the normal use of other equipment, thus ensuring the continuity of heating or cooling; according to the demand of the indoor load, it is designed to automatically start or stop part of the mainframe equipment, which reduces the operating costs; matched with the heat recovery unit equipment, it is free to produce domestic hot water at the same time as refrigeration, and its comprehensive energy efficiency ratio reaches more than 7.0.
Keyword: Full DC Inverter Heat Pump
Get a Free Quote
We welcome you for any inquiries,tell us about your project to receive a no-obligation price quote
Hotline
Address
Building 4,No.7,Xinhui Road,Wusha Community,Daliang Town,Shunde District,Foshan City,Guangdong Province,China
Follow Us