Yanqing Aquatic Service Center Heating Improvement Project


Yanqing Aquatic Service Center, heating area of 3,500 square meters, the original 1-ton coal-fired boiler centralized heater heating, requiring the use of the original heating pipeline, only the original boiler replacement for air source heat pump. Considering the original heating system for the centralized heterodyne system, providing heat for three office buildings, the original pipe diameter is small, the use of a long time caused by scaling, part of the corrosion is serious, the insulation ability to reduce the pressure-bearing capacity of the decline in the pipeline needs to be diagnosed, local repair and flushing, it is appropriate to use a high water temperature, low flow rate of the heating mode.

Yanqing Aquatic Service Center, heating area of 3,500 square meters, the original 1-ton coal-fired boiler centralized heater heating, requiring the use of the original heating pipeline, only the original boiler replacement for air source heat pump. Considering the original heating system for the centralized heterodyne system, providing heat for three office buildings, the original pipe diameter is small, the use of a long time caused by scaling, part of the corrosion is serious, the insulation ability to reduce the pressure-bearing capacity of the decline in the pipeline needs to be diagnosed, local repair and flushing, it is appropriate to use a high water temperature, low flow rate of the heating mode. The building exterior wall is 37 walls, with good external insulation, windows are plastic double-glass, using air-source two-stage high-temperature heat pump unit, heat source system using the same connection to ensure that the unit's hydraulic balance and flow distribution, considering the heating pipeline is long and complex, flushing is difficult, it is in the return main side of the tandem addition of a 800L pressurized precipitation tank, the use of gravity in the water circuit when using the pipeline to make the effect of the iron filings of the impurities accumulated When the water circulates, use gravity to make the pipeline iron impurities accumulate in the precipitation tank, and clean up and discharge the water at regular intervals, thus avoiding repeated cleaning of the Y-filter and ensuring the normal use of the heat pump unit.


The design heating condition supply and return water temperature is 75℃/60℃. The system uses six sets of 25 HP two-stage high-temperature heat pumps from Meiken with model number MAHRW250ZB/S(H2).

 

The project was completed and delivered at the end of November 2016, and the actual 4 units have met the requirements for heating use, with an actual total heat production capacity of 249.6kw and a heating heat load of 71.31w/m2.


The project is entrusted to Beijing Architecture University, School of Environmental and Energy Engineering for no less than 60 days of data monitoring, monitoring data show that: the average winter temperature of the region -9.6 ℃, the total heating power consumption of 133,000 kWh, the cost of electricity is 1 yuan of electricity, the heating cost of about 38 yuan/square meter/heating season, the average efficiency of the winter heating is 2.21. The whole heating season indoor temperature is maintained at 20 ℃, the indoor humidity is 60%, the heating water temperature is 60%, the heating water supply temperature is 2.21 ℃, the indoor temperature is 20 ℃, the indoor humidity is 60%. Throughout the heating season, the indoor temperature is maintained at 20℃, the indoor humidity is 60%, the heating water supply temperature is 62℃, and the return water temperature is 56℃. Due to the reasonable design of the system, the pipeline heat preservation is also well done, the equipment runs quietly, the operation is convenient, and there is no need to control the equipment, and there is no problem of unit frost, noise and so on, which fully meets the user's heating needs, and the owner is very satisfied with the operation of the unit.

Keyword: Full DC Inverter Heat Pump

Get a Free Quote

We welcome you for any inquiries,tell us about your project to receive a no-obligation price quote

+86
  • +86 CN
Submit Message

Address

Building 4,No.7,Xinhui Road,Wusha Community,Daliang Town,Shunde District,Foshan City,Guangdong Province,China

Follow Us

Copyright © 2024 Guangdong Macon New Energy Technology Co., Ltd.

PowerBy:300.cn   Privacy   SEO

business license